Harold A. Campbell Public Use Area

Stand-alone ramp on Stormwater Treatment Area 3/4 (STA 3/4) in South Bay, Palm Beach County

Fee
Free (no launch fee listed)
Lanes
2 launch lanes (1 double ramp)
Hours
Daylight hours (FWC: “Sunrise to Sunset, Daily”)
Trailer parking
11 spaces
Restrooms
Composting toilets (accessible)

Check fees, hours and status with South Florida Water Management District before you go.

All FWC facts

All FWC facts
StatusOpen
Ramp typeStand-alone ramp
AccessGovernment Owned for General Public Use
FeeFree (no launch fee listed)
Launch lanes2 launch lanes (1 double ramp)
HoursDaylight hours (FWC: “Sunrise to Sunset, Daily”)
Trailer parking11 spaces
Car-only parking8 spaces, 2 accessible
RestroomsComposting toilets (accessible)
AccessibilityLow Level of Accessibility
Ramp surfaceConcrete · Good to Excellent
Parking surfacePaved - Asphalt or Concrete · Good
DocksFixed Launch and Staging Dock
WaterFreshwater · Lake or Pond
Water bodyStormwater Treatment Area 3/4 (STA 3/4)
Managed bySouth Florida Water Management District
AddressU.S. Highway 27, Mile 47.3, South Bay, FL 33493
CountyPalm Beach County
Coordinates26.33852, -80.62796
FWC ramp IDBW45573CQ

Map loads when you scroll here. Map images need a connection.

Nearest open ramps

Straight-line distance (as the crow flies), not driving or boating distance.